Project Information
Synergy Engineering B.V. was commissioned by Boskalis/Smit Salvage to design a 1500-ton triangular lift frame for salvage operations offshore Trinidad. The project’s focus was on delivering a functional and robust solution within a stringent timeline.
Design and Standard Compliance: Our engineering approach adhered to DNVGL ST-N001 and DNVGL-ST-0378 standards, ensuring a simple yet sturdy design capable of meeting the challenging requirements of offshore salvage operations.
Key Challenges: The primary challenges were the rapid design timeline necessitated by the project’s urgency and the requirement for the lift frame to be easily rigged in complex diving and height-access conditions.
Client
Boskalis/Smit Salvage
Date
2023
Our Role
Concept and Detailed Design
Category
Structural Engineering & Drafting
Scope Of Work
The task encompassed the conceptual and detailed design of the lift frame, culminating in the delivery of a comprehensive design report, 3D models, FEA models, and 2D design drawings.