Project Information
Synergy Engineering B.V., in collaboration with XPRTHUB, undertook the design of a specialized liftable basket capable of handling 2150 tons. This project exemplifies our expertise in delivering high-capacity engineering solutions for the offshore sector.
Design and Standards Compliance:
The project commenced with a concept design from XPRTHUB, laying the foundation for a functional and innovative final product. Synergy Engineering B.V. meticulously developed this concept into a detailed design, ensuring adherence to the stringent DNVGL guidelines.
Key Challenge:
A significant technical challenge was the integration of an 8-point lift system into the basket design, a complex engineering feat successfully achieved by our team.
Client
Passer
Date
2022
Our Role
Detailed Design
Category
Structural Engineering
Scope Of Work
The scope of our work in the Liftable Basket Project encompassed several key areas, demonstrating our comprehensive approach to engineering design. From advanced analysis to detailed modeling, we ensured that each phase of the project adhered to our high standards of quality and innovation.